How do I add in the summaries?

Length of summary needs to be limited so that they all remain the same length.

Page design for case studies needs to  include two images

Download link for the case study required.

Case Studies

Latest Project

Radius Subterra helps keep 6500 customers’ water on

Working in partnership with contractor CPC Civils and Amey, Radius Subterra have rehabilitated a section of a 12” cast iron water main ahead of schedule, helping Severn Trent Water keep the water on.

Read Full Article

TRUNK MAIN REHABILITATION

Rehabilitation of a water mains trunk supply with major leakage, spanning 538m using the Subline Close Fit PE Lining System.

Read Full Article

Interested?

If you are looking for a cost effective solution to enhance the lifetime of pipelines, get in touch: